Well work has slowed down dramatically.
Apparently the demolition of the Trinity Road is causing vibrations in the Corner Flag Restaurant

This means that the the whole section of the corner of Trinity Road is going to be knocked down by hand. Although this was planned it's meant that work must stop until there is a distinct gap between the two buildings.

We can though breathe a small sigh of relief as the Mosaic at the North end is being saved. They don't appear to making a great job of it though. Check out the huge "scar" on the right hand side. Still it's a start.
There's also a great article in today's Guardian, which is available on-line. If that's no longer available then read it here.
|